top of page

Search


P-38G Cockpit, Gun Bay & Flaps
Next step after finishing preparation work for after market sets (described in previous blog entry) it was time take care of the cockpit...

Lukasz Gmerek
Jun 4, 20215 min read
Â
Â
Â


Prep-work for aftermarket extras
It has been a while since my last blog entry and this is because of other activities happening in my life recently which are taking up...

Lukasz Gmerek
Apr 26, 20213 min read
Â
Â
Â


Miss Virginia is coming!
The Lockheed P-38 Lightning was designed and produced by the Lockheed Aircraft Corporation in response to the 1937 X-608 Specification...

Lukasz Gmerek
Jan 23, 20215 min read
Â
Â
Â


Painting, Weathering and final touches
Painting wise it is three-colour scheme which was adopted during 1938. This comprises RLM 70 Schwarzgrun (Black Green) and RLM 71...

Lukasz Gmerek
Jan 17, 20218 min read
Â
Â
Â


Landing Gear, Propeller and Canopy
While the fuselage was being assembled and prepared for the painting stage I took care of all other smaller elements. I like to have it...

Lukasz Gmerek
Jan 15, 20217 min read
Â
Â
Â


Ju-87 B-2 Fuselage Preparation & Assembly
As shortly described in one of the previous blog entries, the mouldings of this model are very nice and we can find the riveting to be...

Lukasz Gmerek
Dec 24, 20203 min read
Â
Â
Â
bottom of page


